Colocation Move and Migration Guide

1 min read 2 questions answered

Why migration needs a plan

A physical move combines power, network, IP and DNS changes. Without a plan, downtime stretches. At KuzeyDC, remote hands plus NOC coordination shortens the window.

Before the move

  • Export server/U inventory and cabling diagrams
  • Reserve target rack U, A+B power and ports
  • Document IP plan, BGP/peering and firewall changes
  • Finish backup and rollback tests

Cutover day

  1. Announce the maintenance window and tune alerts
  2. Validate physical seating and power
  3. Confirm cutover with network up and service health checks
  4. Decommission the old site only after stability

Successful migration is communication as much as tech: sales, NOC and your team should share one runbook.

Frequently Asked Questions

Find answers to the most common questions about this topic below.

2 questions answered
Is zero downtime possible?

Active-active or phased cutover can get close; single-server scenarios usually need a short window.

Does KuzeyDC organize the move?

We support remote hands, rack prep and power/network validation; logistics scope is confirmed in the quote.